Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 10548

Changing Exchange rate type for Overhead calculation

$
0
0

for calculation of overhead calculation , the exchange rate type used is P the planning rate.
it is assigned in the controlling area version Zero.


But for one of the company codes in the controlling area  , we want to change the exchage

rate type for the overhead calculation to : M -the daily exchange rate.
How can I do that?


Viewing all articles
Browse latest Browse all 10548

Trending Articles