Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 10548

EHP Installation

$
0
0

Hello experts,

 

I have an ERP 6.0 based on NW 7.0 and I have the following questions regarding EHP6:

 

Do I need to go through a minimun SPS for ECC components?  I mean, like a previous activity before using Mopz. The ECC components are in SPS 8.

 

The other issue is that the ERP is dual stack (ABAP + Java). The Java stack was never used, however, will I be facing problems with EHP6 as there's no longer dual stacks for ERP? Do i need to split the system before?, If its not necessary, what will happen to the Java stack?

 

Thanks for your time,

 

regards,

 

cK


Viewing all articles
Browse latest Browse all 10548

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>