Hello experts,
I have an ERP 6.0 based on NW 7.0 and I have the following questions regarding EHP6:
Do I need to go through a minimun SPS for ECC components? I mean, like a previous activity before using Mopz. The ECC components are in SPS 8.
The other issue is that the ERP is dual stack (ABAP + Java). The Java stack was never used, however, will I be facing problems with EHP6 as there's no longer dual stacks for ERP? Do i need to split the system before?, If its not necessary, what will happen to the Java stack?
Thanks for your time,
regards,
cK