Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 10548

Re: EHS Implementation Duration Estimation & Requirements

$
0
0

Dear Mostafa

 

what do you mean if you ask for "hazards"? Are you referring to IHS - Industrial Health and Safety or the new SAP solution EHSM? Becuase this is a great difference.

 

Your questions are to "general". E.g.:

Regarding

Safety + Dangerous goods: This is related to

Basic Data

PS - Product Safety

DG - Dangerous Goods

Report System (WWI)

 

as mentioned.

 

You need to describe you project scope better. On high level regarding PS you have as well: GLM, SVT etc.

 

Generally you need a basic set up in "BAsic Data" to start any EH&S project. Nearly any other EHS Subprocess is based on set up as done in "Basic Data".

 

Furtheron: regarding time estimation: here you have the same "issue". Without a clear of the scope of the project, size of the company etc. nobody can provide suitable numbers; the necesary IT skills can be described on high level. Based on experince the set up of "Basic data" is a project with a length of around 6 months. But this is the "duration" and not the effort involved in the project.

 

Please check this FORUM. the same quesiotn has been asked a lot and you will a lot of infos/information etc. for "high level assesment"

 

C.B.

 

 



Viewing all articles
Browse latest Browse all 10548

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>