Is it possible to directly put-away a production receipt to a Bin? Meaning if i do a CO11N it will confirm to Storage type 100 and bin ABC directly without going through the interim Bin which is the storage type 902 and production order number?
I don't think its possible based on what I know but I want to confirm.
Does it have to go through the interim bin in 902?
Also what are the steps to Bin Determination? Can some one send the steps.