Dear All,
with the experts helps from SCN i've configured packing and handling units.
according to my client requirement packing should happen at order level and that data should flow to delivery.
i've maintained all necessary settings, copy controls.
I can able to do automatic packing, system is flowing the handling unit data from order to delivery but, though material is packed at order level again it is showing material is not packed at delivery level. and it is not copying the total weight and tare weight from order.
Is any copy routine is required for this???
Please help me
Thanks in advance.