Dear Expert,
At time of Cost Estimate through ck11n following error is coming can any body suggest how to fix this error
Material 107020008 in plant 2501: apportionment structure 01 will be used
Message no. CK644
Diagnosis
The joint production process is costed using material 107020008 in plant 2501. However, there are no production versions for this material, or no apportionment structure was specified in the production version selected.
System Response
The system determines the existing apportionment structure 01 for material 107020008 in plant 2501.
Costing attempts to apportion the costs using apportionment structure 01.
Procedure
Check whether the correct apportionment structure was used for the cost apportionment.
In a production version, define the apportionment structure to be used for costing.
thks
Trinath