Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 10548

Re: Production Version is locked in ECC but not in APO

$
0
0

Hi Neha,

There is a special case in SAP note 925381:

If the production version of a product is blocked, the trigger into the

CIF_PPM_CHANGED table is written into the CHANGE field with the value 3

(PPM set to inactive). You then change either the bill of material, the

routing or the recipe of this product. As a result, the CHANGE field in

the CIF_PPM_CHANGED table now receives the value 1 (PPM is changed).

When you subsequently transfer of PPMs, the PPM in APO remains 'Active'

even though the production version is locked.

So you can apply it if it's not in your system yet.

 

Best regards/Tiemin


Viewing all articles
Browse latest Browse all 10548

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>