Requirements Transfer and Availability check

$
0
0

Hi,

 

Iam bit not clear on relation between transfer of requirments and availability check.  I wanted to see in sandbox but regret that it is not working !

 

1) At schedule line category  level, If I just check the "requirements" and do not check "availability check ", Does that mean if the Sales order is created for qty of  10 pcs, the system will reflect 10 pcs in MD04 as requirments   and the system will not do any availability check ? . Iam not so conversant with MD04 and it's relation with requirements transfer.

 

2) Alternatively If I do not check  "requirements" in schedule line category  and  check  " availability". How will the system behave and how will system populate entries in MD04 if we have a sales order of 10 pcs created in system ?

 

3) what if I check both requirements and availability check ? How  requirements t/f to MD04 gets effected ?

 

 

Is there any impact on MRP run/net requirements calculation in each of the three scenarios above ?

 

regards

 

Pamela