Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 10548

Re: EHP Installation

$
0
0

Hello Mario Joseph,

 

Question 1 - Do I need to patch the ECC components to a minimum support package level before going through Mopz? The current SPS for ECC componentes is 8. (ERP 6.0 SPS 8 / NW 7.0).

 

Question 2 - What are the considerations for doing and EHP6 to a ERP 6.0 wich is dual stack (ABAP + Java add-in?, I know that now is not possible to install an ERP dual stack, however, what happen if I already have one and want to go through an EHP6.

 

Question 3 - As I'm only interested in the ABAP Stack, will the mopz allow me to choose only EHP6 for NW AS ABAP or it will consider both stack (ABAP/JAVA)?

 

Question 4 - If I dont use the Java Stack for my ERP, is there a support method for uninstalling the Java stack?

 

Regards,

 

cK


Viewing all articles
Browse latest Browse all 10548

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>